On-time 98.4% Active lanes 212 Hubs 14 Tonnage YTD 1.28M t TEU YTD 46,900 Claims ratio 0.31% Avg quote 38 s CO₂ / t-km −12.6%

Mode 04 · Rail

CN ↔ EU corridor

Rail: ocean lead times, halved.

Six departures a week on the China–EU corridor. 18–27 days terminal to terminal at roughly 0.4× the cost of air and 0.05× its CO₂ per tonne-km.

Departures6 / wkblock trains
Transit18–27 daysterminal to terminal
CutoffD−4 · 12:00customs pre-clearance
CO₂ vs air0.05×per tonne-km

02 · Corridor spec

Rev. 2026-06

Equipment and corridor handling

Rail freight equipment and corridor specifications
ParameterValueNote
40'HC76.4 m³ · 26,000 kgrail payload limit
Chargeable1 : 250kg per m³ volumetric
Gauge changeBrest · Khorgoscrane transfer, 6–10 h dwell
Temperature−20 °C rated linerswinter corridor protection
Customspre-clearedT1 issued before departure
Restrictionsno DG cl. 1, 7lithium PI 965 not accepted

03 · Lane examples

4 of 12 rail lanes

Block-train schedule

Example rail freight lanes with transit, frequency and cutoff
LaneTransitFrequencyCutoffBorder
SHA → WAW22–25 d3 / wkD−4 12:00Khorgos + Brest
SHA → HAM23–26 d2 / wkD−4 12:00Khorgos + Brest
SHA → TLL24–27 d1 / wkD−4 12:00via WAW railport
WAW → SHA22–25 d2 / wkD−4 12:00Brest + Khorgos

04 · Next step

Instant estimate

Price a rail lane - EU, TR and CN gateways quote instantly

Get an instant rail quote